References
Budapest Sewage Works Ltd.
The company's key achievements:
- Proportion of biologically treated wastewater increased to 45%;
- Wastewater treatment in compliance with European Union regulations;
- The country's most modern biological air-filter system implemented at the North Budapest Wastewater Treatment Plant;
- One of Europe's largest and Hungary's first high-temperature thermophilic sludge digester plant installed and commissioned at the South Budapest Wastewater Treatment Plant;
- The South Budapest Plant generates electricity from sewage sludge, and the energy gained in this way almost completely covers the total energy demand of the plant;
- A new waste collection and processing plant was established at the South Budapest Plant providing a solution to the problem of the large amounts of kitchen and other waste with a high organic material content being deposited into the sewage system;
- Since 1997, the number of reconstructed sewers has quadrupled;
- Both the Central Dispatching Service and the remote control system of the sewage pump stations have been renewed;
- Introducing the ISO 9001 and 14000 quality assurance systems.
Szeged Waterworks
The company's key achievements:
- According to public surveys, Szeged Waterworks has been one of the most recognised public utility service providers in the city for years;
- Significant reduction of specific energy consumption;
- Operation of the ISO 9001 quality control system and the ISO 14001 environment oriented control system in the complete field of activity;
- Providing high-quality services in compliance with European Union regulations;
- Maintaining the condition of the water network by correcting faults revealed by leakage tests;
- Controlling drinking water pumps from the central monitoring system and modernising the wastewater-pumping station and water tower central monitoring system.
Salgótarján Sewage Works
The company's key achievements:
- 90% of the population has access to the sewage system service;
- 100% of the wastewater, collected in the town and the three neighbouring settlements, treated biologically and nutrient removal is also carried out;
- Operation of an ISO 9001 quality control system and an ISO 14001 environment oriented control system in all spheres of activity;
- The provision of a high-quality service that meets European Union regulations;
- Planned condition inspections and well organised fault repair activities in the wastewater drainage and treatment system;
- Operation of an accredited wastewater laboratory;
- Carrying out communal liquid waste service from 2004.
Érd and Environs Regional Waterworks Ltd.
The company's most important achievements:
- The capacity extension of the wastewater treatment plant from 5000 m3 to 8000 m3 within record time,
- Utilization of thickened wastewater sludge for the purpose of bio-gas and electricity production,
- Starting large-scale developments having been delayed for years (e.g. the construction of a 300 mm feeding pipe, the construction of the most modern drinking water system with hard polyethylene pipes and electro-fitting connections),
- Starting major reconstructions (e.g. reconstruction of engine-houses, exchange of pumps, etc.),
- The diagnostics of the sewage system has already started,
- Increasing the volume of water produced by the company,
- Operating the ISO 9001:2001 quality management system,
- The opening of a call and customer centre in the heart of the town meeting the requirements of our times,
- Revealing illegal connections.



